fbpx

Eighth Day of The West Virginia Service Trip

Today was our first day at the new work site near Lewisburg. We started the day with moving the bunks from our previous house and enjoying the sunrise. Then we moved job site materials out of the Habitat truck into Habitat’s thrift store. The new house was smaller than the previous site and lacked a porch. One group of students were tasked with installing the porch, setting up the frame and taking measurements. Another group started to complete the siding on the side of the house. This was difficult because we had to make sure that the slope of the roof exactly matched how we cut our siding sheets. After we returned to the Rhenna center where we played another round of basketball. We also prepared food for tonight dinner.

More Blog Posts